Abraham, D M and Dickinson, R J (1998) Disposal Costs for Environmentally Regulated Facilities: LCC Approach. Journal of Construction Engineering and Management, 124(02), 146–54.

Anson, M and Wang, S Q (1998) Performance of Concrete Placing in Hong Kong Buildings. Journal of Construction Engineering and Management, 124(02), 116–24.

Ben-Haim, Y and Laufer, A (1998) Robust Reliability of Projects with Activity-Duration Uncertainty. Journal of Construction Engineering and Management, 124(02), 125–32.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1998)124:2(125)
  • Abstract:
    Today's projects suffer from high uncertainty, great demand for accelerated speed, and severe scarcity of attention of the project manager. At the same time, the schedules of today's projects are expected to be more reliable than ever. This paper presents a new concept for improving the reliability of a project schedule suffering from uncertainty in the duration of its activities. The paper shows that the technique for applying the new concept requires minimal information, incorporates subjective information, is simple to use, and assists in the preparation of project schedules at a desirable level of reliability. Specific examples demonstrate the use of the technique for: (1) calculating the reliability of the project schedule; (2) enhancing the reliability of the project schedule; (3) reducing project duration without diminishing its reliability; and (4) examining how overlapping of project activities affects its reliability.

Chehayeb, N N and AbouRizk, S M (1998) Simulation-Based Scheduling with Continuous Activity Relationships. Journal of Construction Engineering and Management, 124(02), 107–15.

Hsieh, T (1998) Impact of Subcontracting on Site Productivity: Lessons Learned in Taiwan. Journal of Construction Engineering and Management, 124(02), 91–100.

Maxwell, D A, Back, W E and Toon, J (1998) Optimization of Crew Configurations Using Activity-Based Costing. Journal of Construction Engineering and Management, 124(02), 162–8.

Rilett, L R (1998) Effect of Variability on End Product Specifications. Journal of Construction Engineering and Management, 124(02), 139–45.

Rilett, L R (1998) Identifying Component Variability of End Product Specification Tests. Journal of Construction Engineering and Management, 124(02), 133–8.

Shash, A A (1998) Subcontractors' Bidding Decisions. Journal of Construction Engineering and Management, 124(02), 101–6.

Shen, L and Song, W (1998) Competitive Tendering Practice in Chinese Construction. Journal of Construction Engineering and Management, 124(02), 155–61.